The Applicant seeks a grading permit for Holbrook Industrial Building 5 located at the southwest corner of Hudson Way and Redwood Road.
The applicant has received approval on a site plan for the overall site on June 8th, 2023 from the Planning Commission. A grading permit is now being requested by the applicant. The applicant’s narrative states that the grading requires a cut of 118,026 bank cubic yards and fill of 124,219 loose cubic yards, leaving a net of 6,193 cubic yards of soil. The material will be transported off site at a rate of about 16 truck loads a day with a projected completion date three months after the start date. A haul route plan and re-vegetation plan was included in the submitted approximately 1.2 million cubic yards and will be moved to a different location on site.
This is a public hearing item, so please leave a question or comment below.
The Applicant seeks a grading permit for Holbrook Industrial Building 5 located at the southwest corner of Hudson Way and Redwood Road.
The applicant has received approval on a site plan for the overall site on June 8th, 2023 from the Planning Commission. A grading permit is now being requested by the applicant. The applicant’s narrative states that the grading requires a cut of 118,026 bank cubic yards and fill of 124,219 loose cubic yards, leaving a net of 6,193 cubic yards of soil. The material will be transported off site at a rate of about 16 truck loads a day with a projected completion date three months after the start date. A haul route plan and re-vegetation plan was included in the submitted approximately 1.2 million cubic yards and will be moved to a different location on site.
This is a public hearing item, so please leave a question or comment below.
Provide your official comment to be exported and shared at the Planning Commission Regular Meeting.
Please remember to be civil and respectful to all residents, all commentators, developers and the Commissioners in your comments. All comments will be moderated before they are posted to this site. If anything is offensive it will not be posted here.
State Law requires the full name of all those who give comments. Please include your name with your comment.